Projects

Downshire School Re-Roofing

This 4 week re-roofing project at Downshire School entailed :

  •    Stripping off the Existing Built up Felt Roofing System Including Edge Details

·        Supply and fit of treated timber baton system to allow for 80mm insulation system

·        Priming of total roof area, including upstands, with Bitumen Primer

·        Raising and Replacement of the existing Double Skin Diffused Polycarbonate Domes 

·        Resealing of the roofing insulation and roof area including upstands and details using torch applied Plasto-Elastomeric polymer modified bitumen membrane

  •    Replacement of defective decking